close inspection passes on lattice towers ? anyone actually doing this regularly
- Replies 1
- Views 98
- Created
- Last Reply
Top Posters In This Topic
-
battery_life_guru 1 post
-
fpv_flyer_2024 1 post
A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
been doing transmission tower and telecom inspections for a utility contractor for about two years now. mostly using an autel evo ii pro but recently got access to a skydio 2+ for a trial period and the obstacle avoidance is genuinely kind of mind blowing when you're trying to get tight to the steel. that said im not fully sold because the autonomous stuff sometimes does weird things when you're threading through lattice members and it's not always obvious why it's backing off when you think theres clearance.
the bigger question i keep coming back to is how close is close enough for a useful inspection image. like our clients want to see weld integrity, corrosion on the cross members, that kind of thing. right now I'm targeting maybe 3-4 meters from the structure which feels okay but some of the senior inspectors at the utility say they want to see individual bolt conditions which at that distance even with a good sensor you're pixel peeping pretty hard. does anyone push closer than that on lattice steel or is there a sweet spot ive been landing on already without realizing it
also RF interference is brutal on some of these active sites, had a couple scary moments where the compass goes nuts near the top of a loaded tower. just wondering how others are managing that